The Lower Drill Method will realize any kind of pile work in any kind of ground.
@@@@@@@@@@bHOMEbThe Lower Drill AssociationbMemberbDocument request bPrivacy Policyb

Characteristics of the Lower Drill Method

@The Lower Drill Method makes any difficult execution possible by adopting the most suitable method for each diversified construction site.

@@@@@@@@@@@@

ŸLower Drill

œIt is possible to set at any steep slope or slant.Being compact and low gravity,it makes the execution very safe.
œFor temporary bridge and scaffold, only one crane can handle from excavation to installation.
œSpeedy and safe work of ground falling retaining pile by using both screw and down-the-hole-hammer!
œSafe execution with the leaderless at small sites such as railway neighborhood.

œThe superior accuracy by trowel even in a easy-to-fall ground.
œDry excavation,excavation in stabilizing solution or immission of mortar are available depending on the subgrade.


Copyright (C) 2008 Rower Drill. All Rights Reserved.